SafetyOS

LORAT

Risk assessed before the flight is committed.

LORAT, the Layered Operational Readiness Assessment Tool, carries risk assessment upstream of the flight deck, to the points where the risk is actually created. It was developed in conjunction with Volaree Aviation.

The crew should not be the only check.

In most Part 135 operations the FRAT is completed by the crew, before the flight, on the day. By then the trip has been promised, the aircraft assigned, the crew scheduled and the catering and ground transport arranged. The whole operation is moving toward the flight.

A crew FRAT catches fatigue, weather and currency. It cannot see what was decided days earlier: a booking made without operational input, a schedule built under pressure, a deferral that slipped through. Those risks were created upstream, and that is where LORAT looks for them.

Risk assessment belongs to the whole organization, not just the flight deck.

Three layers

One assessment, in three places.

Each layer belongs to the people making the decision at that point in the trip, and each hands what it found to the next.

  1. When the trip is booked

    Before the client is told yes

    Whoever books the trip answers a short set of questions: the runway against the aircraft, the airport against your authorizations, fuel stops, international requirements, the lead time, crew legality, the weather picture. It takes under two minutes. Green proceeds. Amber means a conversation with operations before the commitment is made. Red means not without operations’ approval. A flag does not stop the trip; it makes sure the commitment is one the operation can keep.

  2. In operations

    After booking, before a crew is assigned

    Operations picks up what was flagged at booking and closes it out: aircraft status, crew assignment and legality, fuel and airport confirmation, alternates, quick turns. Every amber item is resolved or formally accepted, with the reason kept. Nothing reaches the crew silently.

  3. At the crew FRAT

    The day of the flight

    The crew FRAT stays what it is today, the crew’s final check. In an operation running LORAT it should surface nothing new. When it does, that is a signal the earlier layers missed something, and SafetyOS sends it to your hazard reports so the cause is corrected where it started.

When a variable becomes fixed

Catch the moment, and act on it.

Some risks are open when a trip is booked and close as it approaches. Weather three days out is something to watch; weather twelve hours out is a fact to plan around. The moment a risk stops being adjustable, someone has to catch it, and the people who booked the trip and the people running it talk. LORAT makes that moment a step, not an accident.

Booking and operations

A bridge, not a gate.

LORAT is not there to slow bookings down. It makes sure every commitment is one the operation can keep, so the gap is never left for the crew to close at the airplane.

The booking makes the promise. Operations makes it real. LORAT connects the two.

LORAT in SafetyOS

An add-on to Solo, Team and Team Plus at $99 a month, and included in Custom. Its records sit beside your FRATs and hazard reports, and what it flags flows into the same safety program.

Used with a Part 5 SMS manual, SafetyOS meets the requirements of 14 CFR Part 5 for safety risk management and safety assurance records.